Driveway sub-base: depth, type and quantity
Direct answer
The sub-base is the compacted granular layer under a driveway surface that spreads vehicle loads into the ground. GOV.UK describes about 200-250 mm of total construction for permeable front-garden drives, including about 150 mm of sub-base. These are illustrative dimensions, not a specification for every driveway. Permeable systems use open-graded material so water can pass through or be stored.
The sub-base spreads vehicle loads and can also store or pass water in a permeable design. Its specification depends on the chosen system and site.
Key takeaways
- The sub-base spreads vehicle loads into the ground beneath.
- GOV.UK describes 200–250 mm of total construction for permeable front-garden drives; it is not a universal depth.
- Permeable paving requires an open-graded sub-base, such as 4/20 or Type 3.
- The cited peg test is a rough clue, not a site design or engineering assessment.
What the sub-base does
Vehicle weight travels through the surface and has to be spread before it reaches the soil. The sub-base is the layer that does the spreading.
It also provides a stable platform so the surface above does not rut or settle unevenly.
- Spreads load into the ground below.
- Provides a level, stable platform for the surface.
- Stores or passes water, depending on whether it is open-graded.
Sources for this section: GOV.UK, Guidance on the permeable surfacing of front gardens (page updated 2021-11-12; text copyright 2009; observed 2026-09-25)
Open-graded for permeable paving
A permeable surface needs a drainage path through or below it. The cited guidance specifies open-graded aggregate for that system; dense Type 1 does not provide the same void storage.
England's GOV.UK guide names 4/20 and Type 3 open-graded aggregate for permeable systems; the sub-base is compacted as in conventional construction.
- The sub-base must have open voids and no fine material.
- Compaction is still required, as for conventional construction.
- The cited GOV.UK guide suggests a short hosepipe check for the finished surface; it is not a drainage-capacity or sub-base design test.
Sources for this section: GOV.UK, Guidance on the permeable surfacing of front gardens (page updated 2021-11-12; text copyright 2009; observed 2026-09-25)
Type 1 working figures from a cited supplier guide
Armstrongs’ MOT Type 1 guide gives a common working estimate of about 2.1 tonnes per cubic metre, within a 2.0 to 2.2 range that varies with moisture and compaction.
The same guide’s general ranges put domestic driveways at 100 to 150 mm compacted depth, laid in 75 to 100 mm layers and compacted with a plate or roller.
Worked through the calculator’s example: a 6 m by 3 m driveway at 150 mm is 2.70 cubic metres, which at the 2.1 estimate is about 5.7 tonnes before any order allowance.
These are that supplier’s labelled working figures, not a specification for your job; check whether any quoted density is loose or compacted before ordering.
Sources for this section: Armstrongs Group MOT Type 1 guide (published 2026-04-23; observed 2026-09-24)
Check the basis of the quoted quantity
A sub-base order can describe the same driveway in different ways. Keep the measured volume, the density basis and any order allowance visible as separate figures.
This page does not apply an automatic compaction factor, and it never assumes a default percentage. Compaction and waste belong to the chosen material and the quoted order, not to a universal rule.
If a supplier or installer quotes tonnes, ask whether that quantity already includes compaction, waste or both. Adding an allowance again to a figure that already includes one can double-count the material.
Where the basis is unknown, confirm loose or compacted density and the allowance before ordering. Do not assume the quoted quantity is compacted or loose without asking.
| Figure | What it describes | What to confirm |
|---|---|---|
| Measured volume | Entered area multiplied by the entered depth | The depth used on the job |
| Density basis | Converts volume into tonnes | Whether the figure is loose or compacted |
| Order allowance | Extra the supplier or job adds | Whether compaction or waste is already included |
Sources for this section: Armstrongs Group MOT Type 1 guide (published 2026-04-23; observed 2026-09-24)GOV.UK, Guidance on the permeable surfacing of front gardens (page updated 2021-11-12; text copyright 2009; observed 2026-09-25)
Judging the ground
The GOV.UK publication describes a 50 mm square peg as a rough check; penetration depth is only a screening clue, not a project design or geotechnical assessment.
If ground is soft, variable, filled or waterlogged, seek competent advice instead of relying on the peg test.
- The guide says easy penetration beyond 150 mm may indicate soft ground; this is a screening cue, not a 150 mm peg length or a construction-depth specification.
- Easy penetration, made ground or variable soil: ask a competent driveway or drainage professional.
- The guidance says clay soils may need a drainage connection; the route and discharge point are site-specific.
Sources for this section: GOV.UK, Guidance on the permeable surfacing of front gardens (page updated 2021-11-12; text copyright 2009; observed 2026-09-25)
Next steps
- Confirm the sub-base depth and grading before ordering material.
- Check the soil type if the ground is soft or clay.